Projects

Liverpool John Moore’s University

Detail Design & Coordination of 2 Major Projects for Morgan Sindall University facilities buildings: At Salford University a £60m RIBA Stage 3 Laboratory & Teaching facility and at LJMU, a new £50m RIBA stage 5 Student Hub & Sports Hall.

Sandwell Aquatics for 2022 Commonwealth Games

A new £70m Swimming Pool Leisure Facility, with attention to hosting the 2022 Games. Design role at RIBA Stage2 & 3 managing the Consultant Design Team to achieve a frozen design, obtain Planning Approval, and comply with Wates’ Framework System requirements.

Circle Square, Manchester

At Circle Square, Manchester; the first of a number of High Rise Residential Apartments in the area. This development for Wates Construction and VITA Student Ownership.

Colindale Apartments

Quality in the build of high rise residential: 480 new apartments above Ground Floor M&S + retail units. I was first appointed in the autumn 2015 to validate the near Completion of this development and achieve handover. I reviewed the façade assembly of the feature 17-storey tower and organised the detailing over the following 18-months to establish the correct build, with an expanded Design Team.

The Crick Institute, The Wellcome Trust, Euston Road, London

Stage D to F development of £700m new medical research building, to define Client Requirements for Laing O’Rourke D&B procurement route. S&T design lead within the large multi-disciplined Design and Construction Team, co-located on Euston Road with Client, Arup and HOK Architects, for ease of coordination. Lead member of Science and Technology Team defining the brief, to deliver the bespoke Cat4 element of the laboratory design.

Manchester City Airport

Client, Manchester Airport PLC “Fast Track” airport expansion project. Site co-ordination of multi-disciplined consultant team. Provision of design instruction and monitoring of management contractor (AMEC) supervision.

Brighton Royal Alexandra Children Hospital

Management of the Design Proposals for Improvement and the Implementation of Construction within an operational working Hospital.

Natural History Museum

NATURAL HISTORY MUSEUM for the Wellcome Trust Foundation with design and construction team, HOK Architects, Buro Happold Engineers, Arup and Shepherd Construction Ltd: Design advice to realise the project at consultancy stage and fix costs. Design Management role, on site, through construction.